Short Communication
'n Bespreking oor lynbalanseringstegnieke
South African Journal of Business Management | Vol 7, No 3 | a3410 |
DOI: https://doi.org/10.4102/sajbm.v7i3.3410
| © 2022 Copyright Status: Not provided. Contact Holding Institution to verify copyright status. Rights Holder: University of Stellenbosch
Submitted: 23 May 2022 | Published: 30 August 1976
Submitted: 23 May 2022 | Published: 30 August 1976
About the author(s)
P. G. Steyn, Departement van Bedryfsekonomie, Universiteit van Suid-Afrika, South AfricaFull Text:
PDF (23MB)Abstract
The problem of balancing assembly lines has been studied by many researchers of operations management. Most of the analytical techniques developed have failed to provide a practical solution. The heuristic methods however have proved most useful in arriving at practical solutions. This article concentrates on the heuristic methods which were developed for assembly line balancing.
Keywords
balancing assembly lines; operations management; heuristic methods
Metrics
Total abstract views: 1523Total article views: 286

