Short Communication

'n Bespreking oor lynbalanseringstegnieke

P. G. Steyn
South African Journal of Business Management | Vol 7, No 3 | a3410 | DOI: https://doi.org/10.4102/sajbm.v7i3.3410 | © 2022 P.G. Steyn | This work is licensed under CC Attribution 4.0
Submitted: 23 May 2022 | Published: 30 August 1976

About the author(s)

P. G. Steyn, Departement van Bedryfsekonomie, Universiteit van Suid-Afrika, South Africa

Full Text:

PDF (23MB)

Abstract

The problem of balancing assembly lines has been studied by many researchers of operations management. Most of the analytical techniques developed have failed to provide a practical solution. The heuristic methods however have proved most useful in arriving at practical solutions. This article concentrates on the heuristic methods which were developed for assembly line balancing.

Keywords

balancing assembly lines; operations management; heuristic methods

Metrics

Total abstract views: 524
Total article views: 61


Crossref Citations

No related citations found.