Original Research

'n Gevallestudie oor die toepassing van 'n optimaliseringsalgoritme vir multi-modelvervaardiging op 'n gegangde produksielyn, uitgesluit skedulering

P. G. Steyn
South African Journal of Business Management | Vol 7, No 2 | a3412 | DOI: https://doi.org/10.4102/sajbm.v7i2.3412 | © 2022 P.G. Steyn | This work is licensed under CC Attribution 4.0
Submitted: 23 May 2022 | Published: 30 June 1976

About the author(s)

P. G. Steyn, Departement van Bedryfsekonomie, Universiteit van Suid-Afrika, South Africa

Full Text:

PDF (24MB)

Abstract

In the previous issue of Business Management an optimisation algorithm for multimodel production on a paced production line was presented. This publication deals with the application of the algorithm to an actual production facility excluding the scheduling phase. The applicability of the algorithm is tested in respect of determining an optimal cycle time for the multi-model production line, optimal batch sizes and balancing the production line for three product types.

Keywords

optimisation algorithm; multimodel production; paced production line

Metrics

Total abstract views: 543
Total article views: 62


Crossref Citations

No related citations found.